Hardhats on campus

Hardhats on campus

Place your cursor on the image below, and click on the arrow for more photos.

Hardhats on campus


Summer 2014: Curious about the construction workers, boom lifts and cranes on campus? Here are 5 things to know.

1. Butler Center and Fontbonne Hall are undergoing a facelift. The expansion and renovation project is expected to be complete in February 2015.

2. The three-story Butler Center is getting an additional 31,500 square feet of new space — that includes varsity locker rooms and lounge space, a cardio room with fitness equipment, a dance studio and a one-story, multi-purpose training center.

3. Butler’s front entryway is being redesigned to include controlled access for added security.

4. A new elevator will be installed in Fontbonne to improve the building’s accessibility.

5. Currently in use: five new classrooms and three lounge areas in the former 10,000-square-foot Fontbonne gymnasium.

Managing Editor
Pauline Oo MLIS Cert’14, MBA'16

Art Director
Dan Woychick, Woychick Design

Alumnae Section Editor
Sara Berhow

Web Producer
Lindsey Carlson

Vice President for External Relations
Blanche "Bea" Abdallah

scan@stkate.edu
651.690.6831 | 800.945.4599